Athabasca Trip Report, April 2004


Unloading the van.


Guying the CSE.


The OSE inside the CSE.


The external temperature sensor was attached to rope handles under CSE lip.


Installing the UPS (UPS removed for transport due to wieght).


The CSE next to AUGO on the first night.


TEC Shroud was attached and caulked with silicon on site.


Camera was pointed to magnetic north. Initial reading were done away from AUGO to reduce error. Direction was confirmed from roof.


Raising the ASI Enclosure.


Rasing the ASI Enclosure.


Leveling the ASI Enclsosure (this was not very accurate, needs design revision).


The installed ASI Enclosure.


The GPS Antenna mounted on roof of AUGO.


Stuffing cables into the CSE.


ASI cables attached to base of 'deck' on the roof of AUGO.


ASI cables attached to 'deck' on the roof of AUGO.


ASI cables connected to ASI Enclosure.


ASI Enclosure and the one meter dome.


The complete Athabasca GBO.


Proof that we caught winter (or that Martin is crazy ... or both).


Alternate Custodian standing of guard for thee ...

List of Deployed Equipment: